My own crack at things found this, FWIW :
https://www.canada.ca/en/department-national-defence/corporate/reports-publications/departmental-results-report/2024-25-index/status-report-transformational-major-capital-projects.html – Status report on transformational and major capital projects
No discernable date, quotes verbatim “30 companies across Canada within the Canadian aerospace and defence industry have been awarded over $3.3 billion in contracts to support the global F-35 fleet.”
https://publications.gc.ca/collections/collection_2011/dpb-pbo/YN5-31-2011-eng.pdf – An Estimate of the Fiscal Impact of Canada’s Proposed Acquisition of the F-35 Lightning II Joint Strike Fighter
Dated March 10, 2011, I glazed over trying to read “Cost Analysis,” but “Industrial And Regional Benefits” was a worthwhile readover.
https://www.queensu.ca/cidp/sites/cidpwww/files/uploaded_files/Claxton16web.pdf – Canada, Democracy and the F-35
Dated 2012, gives a VERY good history of the F-35 program overall and Canada’s part in it so far.
https://natoassociation.ca/wp-content/uploads/2017/05/The-F-35-Fighter-A-Logical-CF-18-Replacement-Final.pdf – THE F-35 FIGHTER: A LOGICAL CF-18 REPLACEMENT
Dated 2017, I gotta admit, opening yoru document with that old wound of the Sea King replacement cluster f**k is a GREAT way to remind me what mess THAT exercise was, and hopefully a cautionary tale…
The contract was cancelled only a few days after Chretien took office costing the taxpayers
almost a half a billion dollars in cancellation fees and lost jobs. It led to a subsequent contract for
fifteen of the same aircraft in the Search and Rescue role five years later. All these aircraft were
built overseas with no Canadian industrial benefit. A much delayed ship-borne helicopter
contract was signed after another four years for aircraft that are only now coming into service
fifteen years later.1 The true total cost of the cancellation including the need to operate a dual
fleet and the requirement to keep the old Sea King helicopters flying for another twenty plus
years will likely never be calculated. But it is indicative of the damage that can be done when
politicians interfere with the process that is supposed to be at arms length.
The paper’s conclusions clearly favor the F-35, but I’ll have to do some reading into this, out of interest.
https://www.cfc.forces.gc.ca/259/290/351/305/Anon05.pdf – F-35 Sustainment Challenges: Considerations for the RCAF
Dated 2024 - 2025, quotes that “The RCAF’s aircraft are to be delivered at Block 4 standard…,” but again, I’m taking that with the appropriate NaCl intake.
https://search.open.canada.ca/qpnotes/record/pwgsc-tpsgc%2CPSPC-2024-QP-00033 – Question Period Note: Future Fighter Capability Project
Dated Aug 28, 2024, of note is this
If pressed on delays related to F-35 Block 4 issues:
This question is best answered by my Department of National Defence colleague
If pressed on Canadian industry opportunities:
The approach to select engine and airframe maintenance depots in Canada is under analysis by the Future Fighter Capability Project team
Typical governmental doublespeak 🙄 🙄
https://www.oag-bvg.gc.ca/internet/English/parl_oag_202506_02_e_44643.html – 2025 Reports 1 to 4 of the Auditor General of Canada to the Parliament of Canada : Report 2—Delivering Canada’s Future Fighter Jet Capability
No discernable date, Will have to read this over, just from a personal curiousity POV 😃
ADDENDUM
In terms of impact on Canada’s economy, I found these :
https://ised-isde.canada.ca/site/aerospace-defence/en/resources/canadian-industrial-participation-f-35-joint-strike-fighter-program – Canadian Industrial Participation in the F-35 Joint Strike Fighter Program reports, only goes up to 2014 though
https://www.f35.com/content/dam/lockheed-martin/aero/f35/documents/OMX_F35_2020.pdf – Economic Impact Report for Canada, dated Feb 2020.
Regards